Reroofing under solar: panel removal and reinstall in Vancouver, WA
A worn-out roof under a working solar array cannot be replaced around the panels; they have to come off, wait safely, and go back on watertight mounts.
- 24/7 phones
- Commercial and specialty
- Vancouver office on Main St

Solar panel removal and reinstall means detaching the array before a reroof, protecting the panels while the new roof goes on, and remounting them on newly flashed attachments. A solar or electrical pro handles the electrical disconnect and reconnect where required. Plan for the panels to be off for a few days to about a week, depending on roof size and weather.
Solar arrays usually outlast the shingles they were set on. Panels often go onto a roof that is already ten or fifteen years old, and a decade later the shingles under them are worn out while the panels still produce power. At that point the array has to come off so we can tear off, replace decking where needed, and lay new underlayment and shingles across the whole slope.
Our crews handle the roofing side of the job: unbolting panels from the racking, removing rails and mounts, storing everything on site, flashing new attachment points into the new roof and setting the array back. The electrical disconnect and reconnect is handled by a solar or electrical pro where it is required, and we schedule around them. If your system is leased, we also coordinate with the company that owns it.
Why the panels have to come off
Shingles under a solar array cannot be replaced in strips. The racking is bolted through the roof into the rafters at many points, and each of those points has its own flashing that has to be lapped into the shingle courses above and below it. Trying to slide new shingles under the rails leaves the old mounts sealed into old material, which is exactly where leaks start a few winters later.
Leaving the old roof in place under the panels is not a good bet either. Shaded shingles under an array stay damp longer in our climate, and moss, needles and nesting material collect in the gap between panel and roof. When we take arrays off, we often find soft decking at the upper mounts and debris packed against the lowest rail, all of which is easier to fix with the panels set aside.
Who does what on a solar reroof
This job involves more parties than a normal reroof, so we set the order of work before anything comes off. Our roofers do the mechanical work on the roof itself. Anything that touches the inverter, wiring or utility connection belongs to a solar or electrical pro, and leased systems may have their own rules on who can handle the panels. We call those parties before we book your dates.
- Solar or electrical pro shuts down and disconnects the system where required
- Our crew removes panels, rails and mounts and stores them on site
- We tear off, repair decking and install the new roof
- New mounts are set into rafters and flashed into the new shingles
- Our crew resets rails and panels in their original layout
- Solar or electrical pro reconnects and tests the system
Mounts, flashing and keeping the roof watertight
The weak point on any solar roof is where the attachments go through. On a new roof we locate rafters again rather than reusing old holes, seal the abandoned holes in the decking, and install flashed mounts that sit under the shingle course above, so water runs over the flashing instead of against a bead of sealant. Sealant alone dries out and cracks after a few of our wet winters.
We also look at how the array will sit on the new roof. Rail height affects how easily needles and leaves wash out from underneath. Some owners add critter guard mesh around the edge of the array while it is off, to keep birds and squirrels from nesting under the panels. Wire runs get secured off the roof surface so they do not rub through the new shingles.
Planning ahead if your roof is aging
If you are thinking about adding solar and your roof is more than about twelve years old, replacing the roof first usually costs less overall than paying for removal and reinstall later. If panels are already on, plan the reroof before leaks start, not after. A slow leak at a mount can rot the decking for a full season before a stain shows on the ceiling, and that turns a planned job into a rushed one.
Signs the roof under your solar needs work
Stains near mount rows
Ceiling or attic stains lining up with the rows of panel mounts usually mean an attachment flashing has failed.
Shingles curling at edges
Curled or cracked shingles visible around the edges of the array suggest the roof under it is worn too.
Granules below the panels
Gritty piles at downspouts on the solar side show the shingles under the array are shedding their surface.
Debris packed under rails
Needles, leaves and moss built up along the low edge of the array hold water against the roof.
Birds nesting underneath
Pigeons or starlings going in and out under the panels bring in nesting material that traps moisture.
Roof older than the panels
If the roof was already aging when the solar went in, it may now be near the end under a healthy array.
How we handle solar panel removal & reinstall
Inspect and coordinate
We check the roof under and around the array, then contact your solar or electrical pro and any leasing company to set the work order.
Disconnect and detach
After the electrical disconnect is handled where required, our crew removes panels, rails and mounts and labels each piece for its original spot.
Store and protect
Panels are stacked on padded supports in a safe spot on your property, covered and kept away from foot traffic and falling debris.
Reroof and flash mounts
We tear off, repair decking, install the new roof, and set new flashed mounts into the rafters as the shingle courses go on.
Reset and hand back
Rails and panels go back in the original layout, then the solar or electrical pro reconnects and confirms the system is producing.
What solar removal and reinstall costs
Pricing for solar removal and reinstall is mostly driven by panel count, roof pitch and how the array is mounted, and it is priced separately from the reroof itself. These are typical ranges for Vancouver and the Portland metro; your real number comes after we look at the roof and the racking. Fees from your solar or electrical pro are separate.
| Job | Typical range |
|---|---|
| Small array, up to about 12 panels | $1,865 to $3,240 |
| Mid-size array, 13 to 24 panels | $3,180 to $5,670 |
| Large array, 25 panels or more | $5,490 to $9,350 |
| Critter guard mesh added during reset | $445 to $1,160 |
Steep pitch, two-story height, older racking that cannot be reused and the number of roof planes the array covers move the price most. See every service side by side in the roofing price guide.
Solar roofs in Vancouver's damp, shaded neighborhoods
Solar in Clark County often goes on the south and west slopes of homes in open subdivisions like Fishers Landing, Sifton and the newer parts of Ridgefield and Battle Ground, where trees are smaller. Those slopes still collect fir needles from neighbors' trees, and the gap under the panels stays shaded and damp through our long rainy season. When we pull arrays here, the most common findings are moss and needle mats along the bottom rail and early rot at the upper mounts.
East wind is the other factor. Gusts out of the Gorge hit Camas, Washougal and east Vancouver hard in fall and winter, and they put real uplift on a solar array. On reinstall we check that every mount lands in solid framing and that the rails are tight, so the panels ride out a windy night without working the flashing loose.
Solar Panel Removal & Reinstall questions
How long are panels off the roof during solar panel removal and reinstall?
For most homes, panels are off for three to eight days. That covers removal, the reroof and the reset. Rain can stretch it, since we do not lay underlayment or shingles in a downpour. Your system will not produce while it is down, so we keep the gap short and book the electrical side well in advance.
Do you do the electrical work for solar panel removal and reinstall?
No. Our crews do the roofing and the mechanical work: panels, rails, mounts and flashing. The electrical disconnect and reconnect is handled by a solar or electrical pro where it is required. We line up the schedule with them so the system is shut down safely before we start and tested after the panels go back.
Can you remove and reinstall leased solar panels in Vancouver?
Often, yes, but leased systems belong to the leasing company, and some require their own crew or written approval before anyone touches the array. We ask you for the lease contact early and confirm what they allow. Sometimes they handle removal and we do the roof; sometimes they approve us to do it. Either way, we plan the dates together.
Should I reroof before adding solar to avoid panel removal and reinstall later?
If your roof is more than about twelve years old, usually yes. A new roof under new panels means both can age together, and you skip paying to take the array off and put it back in a decade. If the roof is newer and in good shape, we can inspect it and tell you how many years it likely has left.
Work that often goes with it
Roof Replacement
Full tear-off and replacement with new underlayment, flashing, vents and your choice of shingle, metal or other roofing.
See the detailsAsphalt Shingle Roofing
New architectural and designer asphalt shingle roofs, with algae-resistant options that hold up under fir shade and rain.
See the detailsFlashing Repair
Repair and replacement of step, wall, headwall and drip-edge flashing where the roof meets walls, dormers and edges.
See the detailsSolar Panel Removal & Reinstall around Vancouver
Our crews do this work across Clark County and the Portland side, including:
Call about solar panel removal & reinstall
Phones are answered 24/7. Tell us what you are seeing and we will set a time to look.